| 作者 | 主题 |
|---|---|
|
xu111 新手 经验值:25 发帖数:10 精华帖:0 |
楼主
主题:在S7-300中,如何实现S7-200中SM0.3的功能:即开机后进入RUN状态,ON一个扫描周期,请各位赐教. |
|
东方红一红 版主 经验值:16855 发帖数:6779 精华帖:50 |
楼
主题:回复:在S7-300中,如何实现S7-200中SM0.3的功能:即开机后进入RUN状态,ON一个扫描周期,请各位赐教.
你必须在OB100中调用SFB21 “RESUME”,原理及注意事项如下。
If there is a rising edge at control input REQ, SFB 21 "RESUME" activates a hot restart on the remote device selected with the ID. The following conditions must be met if the remote device is a CPU: 1、The CPU must be in the STOP mode. 2、The key switch of the CPU must be set to "RUN" or "RUN-P." 3、When you created the configuration with STEP 7, you allowed for a manual hot restart. 4、There must be no condition preventing a hot restart. Once the hot restart has been completed, the device changes to the RUN mode and sends a positive execution acknowledgement. When the positive acknowledgement is evaluated, the status parameter DONE is set to 1. Any errors that occurred are indicated in the status parameters ERROR and STATUS. A restart can only be activated again in the same remote device after the previous hot restart has been completed. 你的明白?更多解释请查看ONLINE HELP。
知其道,用其妙!
|