找答案的高端用户(找答案钻石及双钻级别的用户)将尽可能从此问题下的所有回
答中,为您推荐最佳答案。届时您可以根据推荐数采纳答案。
如果自提问时间起7天内您仍无法选出最佳答案,您可以选择“无满意答案”关闭此问题。
问题
取消精华
首页精华问答
取消推荐
高端用户推荐
申请置评
已申请置评
修改
修改标签
添加标签
官方认证
取消官方认证
修改标签
添加标签
转移分类
删除
{{itemCategory}}
Remedy:
- check the motor data - if required, carry out commissioning.
- check the motor circuit configuration (star-delta).
- V/f operation: Increase up ramp.
- V/f operation: Check the assignment of the rated currents of the motor and Motor Module.
- infeed: Check the line supply quality.
- infeed: Reduce the load when motoring.
- infeed: Correct connection of the line commutating reactor.
- check the power cable connections.
- check the power cables for short-circuit or ground fault.
- check the length of the power cables.
- replace power unit.
For a parallel switching device (r0108.15 = 1) the following additionally applies:
- check the ground fault monitoring thresholds (p0287).
- check the setting of the closed-loop circulating current control (p7036, p7037).
恳请大哥帮帮我,谢谢,希望详细说明一下!谢谢你们!
收藏({{answerDetail.Q_FavoriteCounts}})
手机扫码追踪该问题,
觉得实用,立即去分享!
点击复制链接
专家建议
取消最佳答案
修改
你可以尝试下述的解决方法——
1、检查电机参数是否设置正确;
2、增大变频器的斜坡上升/下降参数值;
3、检查电机的接线(星—三角)方式是否正确;
4、检查整流单元的供电电源是否正常;
5、检查整流单元进线电抗器的连接;
6、检查电机电缆接线情况;
7、检查动力电缆是否存在短路或接地故障;
8、检查动力电缆长度是否超过了限制值。
等您来回答
换一换
{{item.CoinValue}}西币
{{item.VisitNum}}人想问
本版相关问题
换一换
专家置评
首次回答问题,获得
双倍西币积分!
立即成为技术知识分享的一员!
欢迎您访问支持中心!
丰富的视频,全方位的文档,大量的网友交流精华……
为了更好的完善这些内容,我们诚邀您在浏览结束后,花20秒左右的时间,完成一个用户在线调查!
感谢您的支持!

西门子商城