调试中难得意外故障

已锁定

农牧民

  • 帖子

    1
  • 精华

    0
  • 被关注

    0

论坛等级:新手

注册时间:2012-12-07

普通 普通 如何晋级?

调试中难得意外故障

766

0

2012-12-07 23:49:03

Explanation
In an S7 system:
The CPU is in the STOP mode because of a STOP command from the programming device or from a CFB (SFB 20 "STOP").

In an M7 system:
The event can also be indicated on a function module (FM).



Help on Event 5x71

Explanation

This event indicates the end of the start-up synchronization of the PROFIBUS DP master / PROFINET IO controller. If this event does not occur within the monitoring time you have set for the module ready message, the CPU forces the end of the PROFIBUS DP master / PROFINET IO controller start-up synchronization. The detailed information shows the number of stations that have indicated that they are ready.

S7-300:
The event is only generated if stations are missing at the end of the startup synchronization of the PROFIBUS DP master / PROFINET IO controller and a setpoint/actual difference is not permitted.

The number of existing stations is always registered as zero in the event.
看到上面,我没遇到这样的提示。。(背景:调试时候,有人刚好在远程末端的I/O站烧焊,结果末端的站点就烧了,CPU一个站都读取不了,重启也没有用)请教高手。。谢谢
调试中难得意外故障 已锁定
编辑推荐: 关闭

请填写推广理由:

本版热门话题

SIMATIC S7-300/400

共有54622条技术帖

相关推荐

热门标签

相关帖子推荐

guzhang

恭喜,你发布的帖子

评为精华帖!

快扫描右侧二维码晒一晒吧!

再发帖或跟帖交流2条,就能晋升VIP啦!开启更多专属权限!

  • 分享

  • 只看
    楼主

top
您收到0封站内信:
×
×
信息提示
很抱歉!您所访问的页面不存在,或网址发生了变化,请稍后再试。