恭喜,你发布的帖子
发布于 2020-09-30 21:29:13
4楼
今天看一个文档,发现了这个答案:
The Siemens cycles are loaded upon each startup from the CF card to the CPU. This behavior can be
switched off / on by using the service commands sc disable s_cycles / sc enable s_cycles and
performing a subsequent general NC reset.
循环是从CF卡自动装载的,可以通过sc disable s_cycles / sc enable s_cycles命令来关闭循环的装载和打开循环的装载。
请填写推广理由:
分享
只看
楼主