Scan Cycle Load from Communication

Using the parameter "Scan cycle load from communication" you can control the duration of communication processes which always extend the scan cycle time so it does not exceed a specified length. Communication processes can be, for example, data transmission to another CPU via the MP or loading blocks (triggered by means of a programming device).

Test functions with the programming device are hardly affected by this parameter and may greatly extend the scan cycle time. The time available for test functions can be limited in process operation (S7-300 only). 

How the Parameter Works

The operating system of the CPU continuously provides the communication process with the configured percentage of the total CPU processing capacity (time slice technology). If this processing capacity is not needed for the communication, it is available to the rest of the processing.



step7的手册里有这个介绍。

cpu的 cycle /clock memory中, 有个参数Scan Cycle Load from Communication。 

貌似317和400的才有, 就是通讯的 cpu时间片占比。


不忘初心
评论
编辑推荐: 关闭

请填写推广理由:

本版热门话题

SIMATIC S7-300/400

共有54618条技术帖

相关推荐

热门标签

相关帖子推荐

guzhang

恭喜,你发布的帖子

评为精华帖!

快扫描右侧二维码晒一晒吧!

再发帖或跟帖交流2条,就能晋升VIP啦!开启更多专属权限!

  • 分享

  • 只看
    楼主

top
您收到0封站内信:
×
×
信息提示
很抱歉!您所访问的页面不存在,或网址发生了变化,请稍后再试。