回复:cp342-5 v5.1下传CPU315一直有故障

poje

  • 帖子

    4
  • 精华

    0
  • 被关注

    0

论坛等级:新手

注册时间:2003-09-05

普通 普通 如何晋级?

发布于 2003-09-08 11:09:29

0楼

Up to now, the data corruption has only occurred with the CP342-5 (6GK7 342-5DA02-0XE0, hardware release 2) in a central rack and in an expansion rack connected by an IM 360/361. The CP342-5 has been configured as DP master in this case. After repeated power OFF/ON, the outputs of the connected DP slaves (ET200L) would be switched on for short pulses, although they had not been set to do so by the user program. There was no signalling to the corresponding communication block (DP_SEND, DP_RECV). In the NCM diagnostics / STEP7 diagnostic buffer, the message "Output length on DP_SEND block too long by xxx bytes. The configured output data length is yyy bytes" would be entered, for instance, even if fixed data lengths had been parameterized on the communication block. In another case, data corruption occurred in connection with S5-compatible communication. The above module was last shipped with hardware release 2 and firmware version 5.1. In view of the fact that we cannot rule out a possible incorrect response of the CP when using other services (e.g. DP slave, S7 communication over loadable blocks), we have decided on a delivery stop until further notice. We are working hard at localizing and eliminating the error, as well as providing a possible workaround. We shall inform you as soon as the delivery stop has been lifted.
yyy
评论
编辑推荐: 关闭

请填写推广理由:

本版热门话题

SIMATIC S7-300/400

共有54756条技术帖

相关推荐

热门标签

相关帖子推荐

guzhang

恭喜,你发布的帖子

评为精华帖!

快扫描右侧二维码晒一晒吧!

再发帖或跟帖交流2条,就能晋升VIP啦!开启更多专属权限!

  • 分享

  • 只看
    楼主

top
X 图片
您收到0封站内信:
×
×
信息提示
很抱歉!您所访问的页面不存在,或网址发生了变化,请稍后再试。